Discuss Okay Work? in the Australia Tiling Forum area at TilersForums.com.

I

Italy

Problem: plasterboard wall. 8cm spessor. put tiles. with one hand. lot of flexion. I straightened the wall. With the hands :(.
Solution: did cross joint. and vertical. and silicone. result 4 walls. small 1 square meter.
It might work......:(

IMG_1030.JPG IMG_1035.JPG IMG_1037.JPG
 
This thread hasn't been replied to for 14 days, so replying to this one may not get a response. Post a new thread instead.

Reply to Okay Work? in the Australia Tiling Forum area at TilersForums.com

There are similar tiling threads here

    • Like
Work Done Epoxy grout was installed by the Grouting company on the tiles on the external balcony...
Replies
1
Views
3K
    • Like
https://www.tilersforums.com/threads/shower-bath-tiling-preparation-plaster-and-wooden-windowsill...
Replies
1
Views
996
Evening, Hope this post is in the correct section. If not, please feel free to move! I'm...
Replies
1
Views
2K
Hi all I’m so glad to have stumbled upon this forum, which seems to be a treasure trove of...
Replies
5
Views
3K
We recently finished a bathroom renovation where the two builders who did the bathroom also did...
Replies
4
Views
4K

Advertisement

Tilers Forums on FB

...
Top