Over Boarding

  • Thread starter Thread starter MagpieDan
  • Start date Start date
  • Tags Tags
    usa

UK Tiling Forum; Established 2006

Welcome to the UK Tiling Forum by TilersForums.com, built in 2006 by Tilers, run by Tilers.

View all of the UK tiling forum threads, questions and discussions here.

Tilers Forums Official Sponsors

M

MagpieDan

Morning all,

I have a question which may have a very simple answer.

When you're overboading with ply on a bathrooom, kitchen or any floor really, how do you ensure you don't drill through any pipes when screwing the boards down.

Or is it just a bit of pot luck! :lol:

Cheers
 
only use screws long enough to go theorugh your board and into, not through, the timber beneath.

Could also use a pipe detector? Although no good if plastic pipes have been used!
 
Thanks Holohana,
That's what i thought regarding the length of screws, its just i keep reading posts of poor souls who have gone through hot, cold and even gas pipes!
 
It happens, but as holohana said, add the board thickness to the floorboard thickness and minus a couple of mm or so and thats the screw length you need.
 
So do you not screw through the ply, through the floor board and part way into the joist to make sure the ply is screwed down propperly? Is it only necessary to screw the ply into the floorboard and not the joist?
 

Advertisement

Thread Information

Title
Over Boarding
Prefix
N/A
Forum
UK Tiling Forum
Start date
Last reply date
Replies
5

Thread Tags

Tags Tags
usa

Advertisement

UK Tiling Forum

Thread statistics

Created
MagpieDan,
Last reply from
Ric,
Replies
5
Views
2,333

Thread statistics

Created
MagpieDan,
Last reply from
Ric,
Replies
5
Views
2,333

Weekly Email Digest

Back