LM Ceramics
our firm has just started a new hotel with me the only tiler on the job. It was orginally 100 bathrooms for re grout started on monday with the first bathroom what a pain it was slow and time consuming and most of all boring as hell
anyway the hotel only wanted a re grout due to lack of funds but now the last three bathrooms ive done the tiles are coming away from the way and you ve guessed it all spot fixing they have been on for 20 yrs or so to be honest im amazed they have lasted as long
so i told the building contractor about the problem anyway hes convinced the hotel manager to rip the lot out and re tile and quite rightly so
im so happy that i dont have to do all the grouting so now i cant start from scratch:hurray::hurray:
anyway the hotel only wanted a re grout due to lack of funds but now the last three bathrooms ive done the tiles are coming away from the way and you ve guessed it all spot fixing they have been on for 20 yrs or so to be honest im amazed they have lasted as long
so i told the building contractor about the problem anyway hes convinced the hotel manager to rip the lot out and re tile and quite rightly so
im so happy that i dont have to do all the grouting so now i cant start from scratch:hurray::hurray: