J
J Sid
Was working away this morning giving the present job, 200m2 of modular chiseled edge unfilled travertine floor, a clean, pre seal, after being grouted yesterday morning ( 80m2 ) when CTD turned up with another 2 pallets. The delivery driver was amazing at what I was doing, saying he has never seen anyone do it before.
This lead me to wonder how you do your pre seal cleaning.
how do I do it....
assuming no pre grout sealing is required I grout as normal and clean of with the wash boy. To the eye it looks nice and clean. Next day i re clean using a cleaner with either a white pad or maybe a soft broom giving a gentle scrub and the using my Charles wet vac remove all the cleaning water. Then repeat using clean water. From what seems a clean post grouted floor you would be amazed at the dirt that is lifted and remove. Will then leave for 2 to 5 days to full dry out before sealing depending on stone.
How do you clean yours?
This lead me to wonder how you do your pre seal cleaning.
how do I do it....
assuming no pre grout sealing is required I grout as normal and clean of with the wash boy. To the eye it looks nice and clean. Next day i re clean using a cleaner with either a white pad or maybe a soft broom giving a gentle scrub and the using my Charles wet vac remove all the cleaning water. Then repeat using clean water. From what seems a clean post grouted floor you would be amazed at the dirt that is lifted and remove. Will then leave for 2 to 5 days to full dry out before sealing depending on stone.
How do you clean yours?