B
bearwithme
hi lads, could i have your opinions on a job. i keep looking at it and thinking am i being greedy or in fact too cheap. i've got a figure in mind based on my day rate but something about it just isnt sitting right so wondered if you could give me an idea of what you reckon is about right. job is a bathroom to be tiled floor to ceiling, customer will do all the prep so its ready to go for me. labour only, 15m2 wall tiling 400x200 ceramics, no windows or ledges. good condition plastered walls. shower area being tanked. 3m2 floor 330x330 ceramics. no more ply to be laid for tiling. got to remove old suite and fit new one, small amout of pipework involved, just moving toilet and basin 6" to left. bath needs sinking 30mm into partion wall to accomodate new size and shower moving 6" to allow screen to be fitted. thats about it, i know we all have different rates around the country but dont want to keep going in too cheap!! anyone think there should be a minimum we go for on a refurb???? cheers dave.