B
Blunt Tool
Got a call couple of weeks ago, a Glasgow number guy said he worked for a company called Pure Bathrooms, and was looking for a tiler to do an install in Aberdeen following week. 20 to 23 square metres all walls plus floor same tile Porcelain 600x300x12mm all be on site ready. His usual tiler had let him down so could be an ongoing contract as and when required. Joiner and plumber going in Monday and Tuesday to do rip out and first fix then you the tiler in Wednesday then joiner and plumber back in Thursday and Friday to finish! Sorry I said didn’t quite catch that bit, Wednesday? Yes he said to do the tiling, he informed me. So you want me to tile all the walls and floor with 600x300 porcelain, grout, Silicon work Wednesday?
Yes! Was the reply. I cannot and will not try and tile and grout that bathroom in one day I informed him to which he replied he couldn’t believe I would need more time and had never heard of a tiler needing so long!
Am I slow? I usually take around 3 days maybe even another half day for that and that is so long as there is no heated cable?
Yes! Was the reply. I cannot and will not try and tile and grout that bathroom in one day I informed him to which he replied he couldn’t believe I would need more time and had never heard of a tiler needing so long!
Am I slow? I usually take around 3 days maybe even another half day for that and that is so long as there is no heated cable?