K
kaharrison9
Afternoon All.
Thanks for everybody who have put input in up to know.
Time to put a quote together and interested what figures folk would be putting in.
Take up 90m2 of stone and 12mm ply and dispose of.
Overboard with hardiebacker with Ditra on top.
Fit natural stone running through 3 rooms and all meeting up, expansion joints in 4 doorways.
Seal and grout.
This is an insurance job so needs to be on top to cover for any unforeseen scenarios.
Cheers guys.
Kevin
Thanks for everybody who have put input in up to know.
Time to put a quote together and interested what figures folk would be putting in.
Take up 90m2 of stone and 12mm ply and dispose of.
Overboard with hardiebacker with Ditra on top.
Fit natural stone running through 3 rooms and all meeting up, expansion joints in 4 doorways.
Seal and grout.
This is an insurance job so needs to be on top to cover for any unforeseen scenarios.
Cheers guys.
Kevin