Soon to start tiling the floor of our new utility/shower room. The concrete floor has been in place since the extension was built in the 60s and is in good nick. However we needed to patch a corner of the floor where we had to bring in the mains water pipe under the external wall. It is filled with a straightforward cement/sand mix; the area filled is about 60mm deep at its deepest section, and about 60x20mm surface area.

How long do we need to wait for it to cure before I can tile over the top? As it's only a small patch do I still have to follow the 1 day per mm depth rule? It will be the corner behind the toilet so won't get any foot traffic, just the toilet brush sitting on it! Am really hoping I don't have to wait 60 days.

Thanks in advance for the helpful replies I know will be forthcoming from you lovely people :smilewinkgrin:
 
This thread hasn't been replied to for 14 days, so replying to this one may not get a response. Post a new thread instead.

Reply to Recently patched corner of concrete floor - when can I tile? in the Australia Tiling Forum area at TilersForums.com

There are similar tiling threads here

I had a small leak in the main water line before the stop tap in my 1950s house. The copper pipe...
Replies
1
Views
1K
Just seen Rocatex on uHeat.co.uk and thought hmmm that's a new one on me. Anybody used it yet...
Replies
3
Views
1K
We are having some issues with our newly laid tiles. Within several weeks of being laid, we...
Replies
9
Views
4K
David John
D
I'm having my kitchen renovated and the tiler came last week and did the floor tiles. They're...
Replies
5
Views
6K
Had wet system UFH installed on a concrete subfloor to the whole ground floor ie living room...
Replies
2
Views
3K

Advertisement

Tilers Forums on FB

...
Top