I hope someone can help me with some advice please. I am having an extension built woith about 75m2 of ceramic tiling planned for the floor. The builder is putting underfloor heating down (water based) and is going to screed over the top. I have now been told that I must wait 4 weeks until I can tile and I have the tiler booked for Monday. The screed is not due to start until Wednesday this week.
1. How long should I wait for the screed to dry before I can tile?
2. Is there a rapid drying admixture I can insist the builder orders in the screed (it will be readymix)?
3. I have also heard there is a "green adhesive" you can but - does it work, how long do I need to wait before screed and tiling and are there any drawbacks?
Thanks
Colin
1. How long should I wait for the screed to dry before I can tile?
2. Is there a rapid drying admixture I can insist the builder orders in the screed (it will be readymix)?
3. I have also heard there is a "green adhesive" you can but - does it work, how long do I need to wait before screed and tiling and are there any drawbacks?
Thanks
Colin