L
leblanc
I have constructed a platform/plinth around the bath, which means areas of horizontal tiling, including a wide ledge at the non tap end.
I know that you are supposed to apply sealant immediately between the bath and the tiles for flexing. The tiles are small unglazed mosaics.
Should I therefore seal around the bath first then grout? Or should I grout and remove the grout immediately adjacent to the bath, then apply sealant after the grout has dried?
As well as diy I am having tilers finish off the walls and flooring in the bathroom. Does it create any problems if they tile and grout in the same day? It is separate Bal adhesive and grout.
Thanks
I know that you are supposed to apply sealant immediately between the bath and the tiles for flexing. The tiles are small unglazed mosaics.
Should I therefore seal around the bath first then grout? Or should I grout and remove the grout immediately adjacent to the bath, then apply sealant after the grout has dried?
As well as diy I am having tilers finish off the walls and flooring in the bathroom. Does it create any problems if they tile and grout in the same day? It is separate Bal adhesive and grout.
Thanks