:mad2: Job to start next week.
75m large (3 sized) format limestone. 3 bathrooms part walls and floors with UFH.
Anyway, HIS builders have self levelled the floor downstairs. I have keys to the place so in passing today, I called in to see how it looked.
Generally, it looks ok. Small area where a wall was, will need grinding down a bit. A fireplace area does need another bag of self level on it, but I nearly wet myself when I noticed 2 external doors off the kitchen, inward opening, had been self levelled right up to.......you can't open the bloody things at all. So I have to somehow cut the bottoms of, in situ.
Bloody Builders
75m large (3 sized) format limestone. 3 bathrooms part walls and floors with UFH.
Anyway, HIS builders have self levelled the floor downstairs. I have keys to the place so in passing today, I called in to see how it looked.
Generally, it looks ok. Small area where a wall was, will need grinding down a bit. A fireplace area does need another bag of self level on it, but I nearly wet myself when I noticed 2 external doors off the kitchen, inward opening, had been self levelled right up to.......you can't open the bloody things at all. So I have to somehow cut the bottoms of, in situ.
Bloody Builders