A
Antman
I've got 28m2 of flooring to do most is a kitchen-dining area but with adjoining utility room, hall way, cupboard & downstairs toilet.
Can anyone give any tips on setting out and if I should dry lay the whole area in one go before fixing.
Can anyone give any tips on setting out and if I should dry lay the whole area in one go before fixing.