feel like screaming a plumber i have been using for a while who i must say has been good at his own work has started handing me tiling jobs now
done 6 so far for him mostly small ones but i have noticed the prep on them all has been pretty poor but i have dealt with them so far however hes just given me a 30 metre bathroom
the floor hes laid warm up boards for the ufh with keraquik onto the chipboard but didnt screw it down whilst wet with the screws and washers and has come back the following day and screwd it down instead......the floor has popping sounds all over it and also moves in 2 places:yikes:
the ceilings are 3 meters high and old tiling went to 2.5 finished with a wooden thick dado rail
hes cut the old boards off with old tiling and also the plaster with it and re boarded the entire room with 9.5 mm boards which leaves a 10 to almost 14mm step out at the top where it meets the old exisiting painted area that wasnt tiled:yikes:
hes not interested inlistening to me in regards to prep ,really dont want and cant afford to lose out on his work atm but do not want to tile this room as it wont land on my normal standard and also i think the floor may fail
i guess im gonna have to walk away,how are these idiots picking up these jobs i just dont understand it
done 6 so far for him mostly small ones but i have noticed the prep on them all has been pretty poor but i have dealt with them so far however hes just given me a 30 metre bathroom
the floor hes laid warm up boards for the ufh with keraquik onto the chipboard but didnt screw it down whilst wet with the screws and washers and has come back the following day and screwd it down instead......the floor has popping sounds all over it and also moves in 2 places:yikes:
the ceilings are 3 meters high and old tiling went to 2.5 finished with a wooden thick dado rail
hes cut the old boards off with old tiling and also the plaster with it and re boarded the entire room with 9.5 mm boards which leaves a 10 to almost 14mm step out at the top where it meets the old exisiting painted area that wasnt tiled:yikes:
hes not interested inlistening to me in regards to prep ,really dont want and cant afford to lose out on his work atm but do not want to tile this room as it wont land on my normal standard and also i think the floor may fail
i guess im gonna have to walk away,how are these idiots picking up these jobs i just dont understand it