Good evening to the Forum, my first post, advice appreciated. Called to shower leak,
ceiling below on its last legs. Ripped off the tray trim to find void between soggy
bottom edge of plasterboard and shower tray. Dried it out with hairdryer,then ran
bead of 785 in the gap, and bedded in a ceramic effect plastic quadrant and smoothed
off. Couldnt see customer going for bottom course ripped off and put back with a
H*****x under the tile bath trim. Would experienced members have approached
the job differently? Thanks, Dean.