Ok, before i start, I totally misread (as in missed!) the priming instructions on the Mapei 1210 SLC and didn't prime my floor before adding the SLC in my understairs toilet
Anyway, I poured the well and correctly mixed SLC over old black tile adhesive and everything thus far seems ok! The old adhesive was tested for Asbestos and came back positive but was in a good state, not tacky and very very thin.
It's been 72 hours since the pour and the SLC is sound and i haven't noticed any cracks or hollow sounds upon tapping. I know I've messed up but i wanted to know how long will it be before the floor fails, if it is to fail.
Thanks in advance!
Anyway, I poured the well and correctly mixed SLC over old black tile adhesive and everything thus far seems ok! The old adhesive was tested for Asbestos and came back positive but was in a good state, not tacky and very very thin.
It's been 72 hours since the pour and the SLC is sound and i haven't noticed any cracks or hollow sounds upon tapping. I know I've messed up but i wanted to know how long will it be before the floor fails, if it is to fail.
Thanks in advance!