B
bathroomboy
Now looking at putting ufh 10m/m insulation board down and then laying cable and slc over top to bring level up to 20m/m and therefore concrete area for (former which is also 20m/m thick) will not need excavating, it can go straight down on the concrete.Only problem being there will be a step into the room of approx 30m/m when tiled.
Does this sound feasible.
Does this sound feasible.
Last edited by a moderator: