Just finish this kitchen, it was the last bit of the job we started last summer
I re plasterboarded/skimmed ceiling, replastered walls,coved the ceiling. then boarded floor with hardiebacker fixed with flexi and screwed, then tiled in the remaining riven calibrated( yeah right) slate. Been a nice little job this past 6 months on and off, over 40m2 of tiling plus rendering and plastering the big extension.
Nice family as well
---
I am here: http://maps.google.com/maps?ll=53.800035,-2.266468
I re plasterboarded/skimmed ceiling, replastered walls,coved the ceiling. then boarded floor with hardiebacker fixed with flexi and screwed, then tiled in the remaining riven calibrated( yeah right) slate. Been a nice little job this past 6 months on and off, over 40m2 of tiling plus rendering and plastering the big extension.
Nice family as well
---
I am here: http://maps.google.com/maps?ll=53.800035,-2.266468
Attachments
-
ImageUploadedByTapatalk1327603925.772000.jpg94.7 KB · Views: 68
-
ImageUploadedByTapatalk1327603949.319612.jpg102.8 KB · Views: 63
-
ImageUploadedByTapatalk1327603968.213465.jpg80.2 KB · Views: 64
-
ImageUploadedByTapatalk1327603985.089250.jpg96.8 KB · Views: 63
-
ImageUploadedByTapatalk1327604003.296661.jpg114.5 KB · Views: 67
-
ImageUploadedByTapatalk1327604024.652494.jpg72.4 KB · Views: 63
-
ImageUploadedByTapatalk1327604041.397599.jpg58.4 KB · Views: 61
-
ImageUploadedByTapatalk1327604064.000542.jpg120.7 KB · Views: 61
-
ImageUploadedByTapatalk1327604096.149458.jpg103.1 KB · Views: 60
-
ImageUploadedByTapatalk1327604112.378741.jpg119.3 KB · Views: 62