I had a concrete screeded floor with tile adhesive. I have removed thetile adhesive which was a nightmare but now have the following problems:
1, Some areas the screed is falling apart, should I remove the screed down to damp proof membrane and re-screed or use a different product?
2, Most areas of the floor there are little hollows which are too deep just for slc - is screed the correct thing here as there is not much area or depth in most cases?
3, What product can I add to the screed to speed up drying time so I don't need to wait 2 months before laying the new floor.Adding a floating wooden floor on top if that is relevant.
4, Do I need to wait a set amount of time before adding slc?
5, Do I need to primebefore adding slc?
And finally, possibly a stupid question...
6, if slc is only 1mm or 2mm thick in places will this be a weak area?
Andy
1, Some areas the screed is falling apart, should I remove the screed down to damp proof membrane and re-screed or use a different product?
2, Most areas of the floor there are little hollows which are too deep just for slc - is screed the correct thing here as there is not much area or depth in most cases?
3, What product can I add to the screed to speed up drying time so I don't need to wait 2 months before laying the new floor.Adding a floating wooden floor on top if that is relevant.
4, Do I need to wait a set amount of time before adding slc?
5, Do I need to primebefore adding slc?
And finally, possibly a stupid question...
6, if slc is only 1mm or 2mm thick in places will this be a weak area?