C
cgadmin23
Hi All,
I recently purhased a Tuff 2 former and tanking kit (Dura WP) and am about to start laying the membrane. Before doing this can you please tell me if I need to prime the floor surface first? The floor is a 22mm plywood substrate which has been sealed using BAL Bond SBR on the bottom and sides. Do I need to prime the top surface and if so what primer do I need to use.
Also my tanking kit is 10m. I have a Tuff2 tray former that measures 1300 x 800. Should I be tanking the entire bathroom floor or just the tray former area?
Any help and advice appreciated.
Kind regards
Chris
I recently purhased a Tuff 2 former and tanking kit (Dura WP) and am about to start laying the membrane. Before doing this can you please tell me if I need to prime the floor surface first? The floor is a 22mm plywood substrate which has been sealed using BAL Bond SBR on the bottom and sides. Do I need to prime the top surface and if so what primer do I need to use.
Also my tanking kit is 10m. I have a Tuff2 tray former that measures 1300 x 800. Should I be tanking the entire bathroom floor or just the tray former area?
Any help and advice appreciated.
Kind regards
Chris