T
tweakyboy
Just boarding my shower area at the moment with hardibacker 500 and I'm after a little information.
I'm planning to mastic the tray to the walls, but when tanking do I tape between the shower tray and the wall, then tank over that? Or just tank the wall and just leave the mastic on the back of the tray as the initial seal?
Also for filling the small gaps where the boards meet do I have to fill those with some of the adhesive I'm going to use to tile?
I'm going to use BAL WP1 as the tanking kit.
Thanks in advance :smilewinkgrin:
I'm planning to mastic the tray to the walls, but when tanking do I tape between the shower tray and the wall, then tank over that? Or just tank the wall and just leave the mastic on the back of the tray as the initial seal?
Also for filling the small gaps where the boards meet do I have to fill those with some of the adhesive I'm going to use to tile?
I'm going to use BAL WP1 as the tanking kit.
Thanks in advance :smilewinkgrin: