Tiling a soon to be gutted bathroom. Porcs on think plaster skimmed concrete block. (Weight limit only a tad over, tiles at about 18.5kg and add 2-5 for adhesive? so about about 22kg in total i guess).
Now, the question please if I may: Im inclined to want to tile all floor and and all walls before butting bath up againt now tiled wall. Is there any advantage or best practice regarding this vs tiling down onto a bath (and leaving area agaisnt wall below bath edge non tiled)?