Could someone advise me please?
One floor is concrete, the other one is plywood supported by a metal structure underneath (extension area)
My plan is to get the 2 floors level whit cement boards, then apply floor leveler, go over the area with DITRA Matting and install an expansion joint where the 2 floors meet.
Finally tile over the whole thing. Please, advise anyone?
Thanks guys