- 1
- 513
I'm starting a hall on Monday 2.5 x 7.5m. Will be laying herringbone pattern like attached pic. Hall was originally 2 rooms, now knocked into one, 2/3 is tiled, rest is wood flooring on solid floor. Levels are not great, where tiled part meets kitchen the last 400mm or so slopes up 25mm to meet kitchen floor level exactly. Cust wants same 'no-step' join (although I will leave an expansion gap). This means I have a heck of a lot of slc to pour to bring it all up to same level. I will graduate slope over whole length of floor so is straight but not perfectly level, which I need with the herringbone pattern.
I was thinking I could leave most of the existing tiles down as I really need the height. Plan is to clean thouroughly, mapei ecoprime?, slc then tile over.
Should I put slurry coat over tiles before slc ?
I was thinking I could leave most of the existing tiles down as I really need the height. Plan is to clean thouroughly, mapei ecoprime?, slc then tile over.
Should I put slurry coat over tiles before slc ?