Hi,
New to the site and first post.
I need some advice please. I have 2 quotes from tilers and one has said that self levelling is a waste of time and money and the other tiler said he our floor would need self levelling first.
Our floor is concrete with underfloor heating and is a little wavey in places and chips in it. Tiler 1 said he would use adhesive to pack out and build up and level the tiles which are 60x40x15 limestone. There is about £1000 difference in the quotes and unsure if self levelling is needed. Also I know prices will differ depending on location but is there anywhere I can find out the average cost of a job like mine. Any advice/help.would be greatly appreciated. Thank you
New to the site and first post.
I need some advice please. I have 2 quotes from tilers and one has said that self levelling is a waste of time and money and the other tiler said he our floor would need self levelling first.
Our floor is concrete with underfloor heating and is a little wavey in places and chips in it. Tiler 1 said he would use adhesive to pack out and build up and level the tiles which are 60x40x15 limestone. There is about £1000 difference in the quotes and unsure if self levelling is needed. Also I know prices will differ depending on location but is there anywhere I can find out the average cost of a job like mine. Any advice/help.would be greatly appreciated. Thank you