R
roberto1490
right, this is my first DIY project and my wet room is gonna be the death of me. i'm nearly at the tiling stage now. i've got a 1500 x 820mm tuff 2 tray with an offset drain. i've made a template of the tray so i can do a dry run of the tiles (which i haven't chosen yet).
Trouble is the mitres don't meet up with the corners of the drain grid but several cm from the corners instead and i'm not even sure there is any gradient near the centre of the drain. my question is shall i just mitre the tiles all the way to the drain grid even though it doesn't look right or shall i get the joints to meet at a flatish square area just outside the drain grid area?
or should i just use mosaic tiles in the shower area and standard tiles on the rest of the bathroom floor? if so how would i cut the mosaic tiles?
hope this thread makes sense, it's very hard to explain without a picture
Trouble is the mitres don't meet up with the corners of the drain grid but several cm from the corners instead and i'm not even sure there is any gradient near the centre of the drain. my question is shall i just mitre the tiles all the way to the drain grid even though it doesn't look right or shall i get the joints to meet at a flatish square area just outside the drain grid area?
or should i just use mosaic tiles in the shower area and standard tiles on the rest of the bathroom floor? if so how would i cut the mosaic tiles?
hope this thread makes sense, it's very hard to explain without a picture