Advice please.
I have a wall I wish to tile that has a square 8 gang grid isolation switch panel.
The tiles are about 8mm thick and wish then to go under the front plate.
Hench I need the front pate further forward, together with the switches.
Behind the front plate are two grid panels on top of each other each carrying 4 switches which are in turn fixed by 2 - m3.5 screws to the back box in the wall
How do are bring forward the switch grid panels.
If I loosen the m3.5 screws the grid panels become loose and floppy.
It is crying out for some kind of packing or is it a matter of bringing the whole back box in the wall forward by 8mm or so.
 
This thread hasn't been replied to for 14 days, so replying to this one may not get a response. Post a new thread instead.

Reply to Tiling behind a grid isolation switch panel in the America Tile Forum area at TilersForums.com

There are similar tiling threads here

HI, Excuse the length and new thread, but it reads super fast. I could use some advice. There...
Replies
5
Views
4K
eric123
E
HI, Walls are prepped, have the right materials and tools, but still debating the layout on...
Replies
6
Views
3K
Just taken on my first job, previously done heating and plumbing but wanted to tackle full...
Replies
1
Views
2K
Hi, I have been asked to tile under and behind a log burning stove... I am happy with the...
Replies
17
Views
9K
Basically I have a tiled floor in a toilet with skirting in place, as we were not sure if we...
Replies
23
Views
16K

USA Tile Forum Popular

America Tile Advice Trending

Advertisement

Birthdays

Tilers Forums on FB

...
Top