I had assumed that when tiling on the long wall beside a bath that the bath would be installed and tiling would commence from the bath up.
A tiler informed me that he usually tiles from the floor up first, then once completed, the bath is installed. It means if the bath is changed to a new bath or to a shower unit that that section of the wall does not subsequently have to be tiled with tiles that may no longer be available in any case.
If the tiling is put in first from the floor, does the bath still need a full length timber along the wall (under the bath lip) to support it to help prevent the seal along the wall from breaking?
All the floor would be tiled, including under the bath.
A tiler informed me that he usually tiles from the floor up first, then once completed, the bath is installed. It means if the bath is changed to a new bath or to a shower unit that that section of the wall does not subsequently have to be tiled with tiles that may no longer be available in any case.
If the tiling is put in first from the floor, does the bath still need a full length timber along the wall (under the bath lip) to support it to help prevent the seal along the wall from breaking?
All the floor would be tiled, including under the bath.