R
R8SS
Good Evening,
Although I haven't posted yet I just want to say thank-you for the invaluable advice on this forum.
I am nearing the end of an en-suite refurb with only the floor left to do. It is a small floor area (approx 1200 x 1100mm). The floor is chipboard which I plan to overboadr with No More Ply, underfloor heating and then tiles.
My question is, I have some tanking materials left from the shower - is there any disadvantage to tanking over the chipboard before overboarding with the NMP?
I guess it's a case of using up the materials and a bit of belt and bracres?
Many thanks
Although I haven't posted yet I just want to say thank-you for the invaluable advice on this forum.
I am nearing the end of an en-suite refurb with only the floor left to do. It is a small floor area (approx 1200 x 1100mm). The floor is chipboard which I plan to overboadr with No More Ply, underfloor heating and then tiles.
My question is, I have some tanking materials left from the shower - is there any disadvantage to tanking over the chipboard before overboarding with the NMP?
I guess it's a case of using up the materials and a bit of belt and bracres?
Many thanks