U
upthecreek
Hi there, I have read a lot about tiling on new screed and I'm still confused. Before I start with the questions I must state that I am not doing this job and I have got someone in but I am unsure that it's been done correctly. I have a 5 square meter utility room where the floor had to brought level with kitchen and then tiled throughout. Before this started, a trench was cut through the utility room (aprox 200mm x 200mm) in order to lay a soil pipe for the addition of a new cloakroom toilet. 2 days ago a sand/cement mixture was then pored to fill the trench and level the floor. Excluding the depth of the trench the screed was between ( 40mm-60mm). My tiler who was also the person who did the screed is telling me that he can tile in a week (he is using BAL stone and tile PTB). However there is conflicting advice surrounding thist. from a day for every mm to 1 week in total. I'm a typical customer and do not want to wait 60 days or more. I don't think he will be able to DITRA mat as this will bring the floor higher than the tiles in the kitchen (which he has already laid). Is BAL green cement adhesive the best option and how soon can this be applied after the screed has been laid. I wan't to get my facts right before he comes back in 5 days. I just want the job done right!