hi all newby here...we have purchased a 1970 bungalow, turning into a bit of a nightmare, evidently the dpm subfloor is an Asphalt about 20 mm thick. can i tile onto this in our en-suite...what primer, preparation do i need.
Second Bigger question....We had planned to have Amtico laid onto our new underfloor heating in the main living area's, which uses a Mapie Ultraplan Maxi Self leveling compound ( its rebranded by the heating supplier) over wet under floor heating which is laid into a castellated plastic sheeting, about 22 mm thick stuck to the subfloor with a primer. The contractor who laid the heating also did the latex leveling, although its not what i would call level !! anyway..our specialist floor company tested the floor and we have high moisture levels after 3 months and having the undefloor working. Also sounds blown in a few places to. He needs to put more leveling down to compensate for the poor original and obviously to ensure a good finish for the Amtico. the flooring guy is concnerned the leveling is not mositure tolerant and will fail so he won't at the moment lay the 8 k flooring which is sitting in his warehouse......which i understand as he couldn't warranty it.
i've been told the whole thing may need to come up and be redone...to get to a moisture level acceptable for Amtico...my wifes not pleased aprox 75 m2 Mapie Rep is coming out to have a look and also give advice and report, they seem really good. we coul dput a moisture tolerant flooring down but that's not what we wanted...
any pointers Guidance advice welcome..
Second Bigger question....We had planned to have Amtico laid onto our new underfloor heating in the main living area's, which uses a Mapie Ultraplan Maxi Self leveling compound ( its rebranded by the heating supplier) over wet under floor heating which is laid into a castellated plastic sheeting, about 22 mm thick stuck to the subfloor with a primer. The contractor who laid the heating also did the latex leveling, although its not what i would call level !! anyway..our specialist floor company tested the floor and we have high moisture levels after 3 months and having the undefloor working. Also sounds blown in a few places to. He needs to put more leveling down to compensate for the poor original and obviously to ensure a good finish for the Amtico. the flooring guy is concnerned the leveling is not mositure tolerant and will fail so he won't at the moment lay the 8 k flooring which is sitting in his warehouse......which i understand as he couldn't warranty it.
i've been told the whole thing may need to come up and be redone...to get to a moisture level acceptable for Amtico...my wifes not pleased aprox 75 m2 Mapie Rep is coming out to have a look and also give advice and report, they seem really good. we coul dput a moisture tolerant flooring down but that's not what we wanted...
any pointers Guidance advice welcome..