F
Flintstone
I've got a flooring job coming up, about 15m in a kitchen, over existing tiles which are very solid and onto a. Solid floor. I'm gonna prime with prime plus grip and put some leveling down as its a bit up and down then tile it. Over the years I have tiled onto tiles without any special primers, I do like the prime grip tho, is it necessary really? Thoughts?