P
paulp4u
Hi
I am working on a selfbuild, the bathrooms upstairs are ready to start tiling.
They have a 22mm chipboard floor in the bathrooms, there is underfloor heating running through pipes clipped to the underside of the boards.
I am thinking of using 6mm hardiebacker board on top of the chipboard and then tiling.
just wanted to check is this the best way to go before i start.
Thanks in advance
I am working on a selfbuild, the bathrooms upstairs are ready to start tiling.
They have a 22mm chipboard floor in the bathrooms, there is underfloor heating running through pipes clipped to the underside of the boards.
I am thinking of using 6mm hardiebacker board on top of the chipboard and then tiling.
just wanted to check is this the best way to go before i start.
Thanks in advance