Hi all,
I have bought a house built in the 70's. The one wall in the bathroom that is half plastered when it was 1st built. The bottom half is back to the bare brick as the previous owners for some reason decided to take off the plaster.
Anyway I know I need to use bonding plaster and a top coat of multifinish.
I cant use plasterboard as the depth is only about 8mm.
Can anyone advise me on how long I should wait until I prime & tile over the new plaster.
Thank you in advance.