H
Happy Tiler
Hi All, several questions; how long should I leave newly plastered walls before tiling the bathroom? Can I get away with priming walls with Bal SBR or Prime APD prior to tiling and are these suitable for both plaster and plasterboard? Or, should I use Mapai Primer as I'm thinking of using Keraflex Mapai powdered adhesive? I've tiled bathrooms in the past but never bothered priming and used 6"sq tiles back then (never had any tiles fall off!). Am using 400x250x8mm tiles this time. Some advice would be much appreciated!:helpsmilie: