T
Taz8130
Here are a few before & after pics of a full bathroom installation I have just completed. The guy told me that he moved into the house with his parents when he was 5 y.o and nothing has been done to the property since. He is now 68 y.o by the way !!
The system was that old that all the waste & overflow pipes were in lead ! Plaster fell from the wall in huge chunks so shower was fitted after I installed a 2x2 framework covered with Aquapanel
The system was that old that all the waste & overflow pipes were in lead ! Plaster fell from the wall in huge chunks so shower was fitted after I installed a 2x2 framework covered with Aquapanel