W
wobblyheed
Hi all.
Got the Mapei Shower Waterproofing kit. Going to be waterproofing moisture resistant plasterboards around a bath.
The kit says to "prime all porous substrates and gypsum plaster with the enclosed primer"
So I was wondering, do I just need to prime where I've filled and taped the joints in the boards, or should I give the whole surface of the board a coat of primer?
TIA
Got the Mapei Shower Waterproofing kit. Going to be waterproofing moisture resistant plasterboards around a bath.
The kit says to "prime all porous substrates and gypsum plaster with the enclosed primer"
So I was wondering, do I just need to prime where I've filled and taped the joints in the boards, or should I give the whole surface of the board a coat of primer?
TIA