Hi everybody
I wonder if I might ask a couple of general questions please?
I am due to fix 6 mm Hardibacker on top of new chipboard I will prime with APD and fix with screws and a 6 mm square notched trowel for adhesive.
I then need to fix 600 x 600 porcelain on top, I will back skim and then would like to make sure my floor trowel is suitable?
Notches are 20 mm wide and 10 mm deep.
Many thanks in advance
Rich
I wonder if I might ask a couple of general questions please?
I am due to fix 6 mm Hardibacker on top of new chipboard I will prime with APD and fix with screws and a 6 mm square notched trowel for adhesive.
I then need to fix 600 x 600 porcelain on top, I will back skim and then would like to make sure my floor trowel is suitable?
Notches are 20 mm wide and 10 mm deep.
Many thanks in advance
Rich