I have laid a UFH mat on top of No-more-ply sealed with Bal WP1 , with a trench for the probe cable and the power cable, both of which are in pvc tubing.
Q1 Do I lay the tiles directly on top of the Heat mat or do I apply a layer of tile adhesive on to the heat mat and then lay tiles when the first layer is dry?
Q2 is the probe itself embedded in the tile cement, or does it sit in the pvc tubing?
I am using Bal PTB flexible with admixture GT1 and Porcelain tiles
Q1 Do I lay the tiles directly on top of the Heat mat or do I apply a layer of tile adhesive on to the heat mat and then lay tiles when the first layer is dry?
Q2 is the probe itself embedded in the tile cement, or does it sit in the pvc tubing?