Hi all, gladI found this forum, looks useful.
I have UFH in an outside wet room (converted garage). Its been laid in screed and tiled over. Been in for 6 weeks and I am about to turn it on. Was just going to turn it on full whack but luckily googled and came across this forum and assume if I was to do that the screed would crack!
The advice from some posts Ive seen here (if Im reading right) seems to be start at a low temp, leave it on and then go up in 5 degree increments. Is this right and if so what temp should I start at. Does the fact that its currently minus 1 degrees outside make a difference. Would I be better off waiting til the weather is a bit hotter so there wont be an extreme jump in temperature!
I have UFH in an outside wet room (converted garage). Its been laid in screed and tiled over. Been in for 6 weeks and I am about to turn it on. Was just going to turn it on full whack but luckily googled and came across this forum and assume if I was to do that the screed would crack!
The advice from some posts Ive seen here (if Im reading right) seems to be start at a low temp, leave it on and then go up in 5 degree increments. Is this right and if so what temp should I start at. Does the fact that its currently minus 1 degrees outside make a difference. Would I be better off waiting til the weather is a bit hotter so there wont be an extreme jump in temperature!