Hi fellow tilers, just after some advice.....
Tiling a room on saturday, I've levelled out the concete floor and bonded it, then going to lay insulation boards using flexi adhesive and then laying the ufh mat over the boards and then slc over the top to a thickness of 5 mm, am I ok letting the slc run up to the walls and the edge of a pvc door ledge? I'm using flexi slc, so presume i'm ok doing this. Packet says to leave for 12 hours before tiling.
Cheers
Rob
Tiling a room on saturday, I've levelled out the concete floor and bonded it, then going to lay insulation boards using flexi adhesive and then laying the ufh mat over the boards and then slc over the top to a thickness of 5 mm, am I ok letting the slc run up to the walls and the edge of a pvc door ledge? I'm using flexi slc, so presume i'm ok doing this. Packet says to leave for 12 hours before tiling.
Cheers
Rob