C
chubchub
Hi guys new to the forum and am in need of some advice. Got my first victorian tiling job in a few weeks customer is fine for me to do job without giving him a quote as have done lots of work for him in the past but am not sure how to price it, day rate or by the meter.
Floor is bout 9sqm in total 100mmx100mm tiles plus boarder plus external tile to cut into walls.
Floor is 9mm wpb. Have a rough figure in mind inc materials £*** inc materials going on basis of 3 to 4 days.
Also an idea on setting out aswell whats best ect.
Andy
Floor is bout 9sqm in total 100mmx100mm tiles plus boarder plus external tile to cut into walls.
Floor is 9mm wpb. Have a rough figure in mind inc materials £*** inc materials going on basis of 3 to 4 days.
Also an idea on setting out aswell whats best ect.
Andy
Last edited by a moderator: