well im home walked off job i was on hotel in malton , just cant make it pay , plus poor prep work by contractor
400x400 20mm thick marble onto timber floors over laid with 6mm ply , £15.00 m2 theres upstand to fit , which is included in price
the biggest floor is about 5m2 all cuts
this is a grade 2 listed building the floors are all over the place , overlaid over original floor boards which are up and down , asked why you hav,nt sorted floors out client likes the floors like this adds to the character , so why are we trying to fix marble to this , forget it
400x400 20mm thick marble onto timber floors over laid with 6mm ply , £15.00 m2 theres upstand to fit , which is included in price
the biggest floor is about 5m2 all cuts
this is a grade 2 listed building the floors are all over the place , overlaid over original floor boards which are up and down , asked why you hav,nt sorted floors out client likes the floors like this adds to the character , so why are we trying to fix marble to this , forget it