Evening All !! just working a quote out and thought id run it by you lot to see if iam going in to cheep !
JOB : Kitchen walls and floor
TILES : Ceramic
WALLS : Plaster board nice and flat
FLOOR : Concrete . lyno and laminate floor to come up . floor is almost flat but will be screeding over anyway . screed 2 bags.
Wall area is 11mtrs but theres a lot of cutting as the kitchen is fitted and the area to be tiled is the full walls top to bottom, also 6 chrome trims to supply and a wooden window cill to smash out and build up and Tile.
Floor area is 13mtrs fairly flat but to be screeded . tiles are Ceramic , will need 2 laminate to tile edges for the doors.
I recon 2 / 2.5 Days for the walls. and get £352 all in.
I Think 2 days should do the floor and get £384.50 all in.
Total £736.50 over 4/5 Days. What would you guys get ? Cheers !
JOB : Kitchen walls and floor
TILES : Ceramic
WALLS : Plaster board nice and flat
FLOOR : Concrete . lyno and laminate floor to come up . floor is almost flat but will be screeding over anyway . screed 2 bags.
Wall area is 11mtrs but theres a lot of cutting as the kitchen is fitted and the area to be tiled is the full walls top to bottom, also 6 chrome trims to supply and a wooden window cill to smash out and build up and Tile.
Floor area is 13mtrs fairly flat but to be screeded . tiles are Ceramic , will need 2 laminate to tile edges for the doors.
I recon 2 / 2.5 Days for the walls. and get £352 all in.
I Think 2 days should do the floor and get £384.50 all in.
Total £736.50 over 4/5 Days. What would you guys get ? Cheers !