Hi, looking to do two projects:
PROJECT (A): Want to bring garage WC to below the stairs pantry
PROJECT (B): Then maybe turn the garage WC area into a shower room
Pic of the PROJECT (A) basic move:
Pic of the garage WC:
Pic of the pantry area:
Garage WC and Pantry on either side of the same wall with the Garage WC being a step down:
Further pics and details here:
Move Garage WC to understairs Pantry and convert Garage WC to a Shower Room - https://photos.app.goo.gl/GtCgH2a9YbByReJy8
First step is PROJECT (A) and its a nightmare tyring to find one person/company to do this at this time. So working out what I can do myself and the plumbing is the main issue so hence posting here. Can post elsewhere if needed:
I think the steps to do PROJECT (A) is:
1 Get the plumbing in for the new WC by extending waste through the wall
2 Plumb in the feeds for the WC and small sink
3 Fix a stud wall for the cistern and pan to sit against
4 Do the pantry floor
5 Plumb and bolt in the WC
6 Plumb and fix in the sink
7 Fix an ventilation fan
8 Make a door into the hallway
9 Stud wall where the current door is
These steps make sense?
Anything I am missing or anything else worth considering?
Welcome feedback, will have questions. Ta!
WC into understairs pantry - queries... anyone here? for the original thread on Plumbers Forums
Hi, looking to do two projects:
PROJECT (A): Want to bring garage WC to below the stairs pantry
PROJECT (B): Then maybe turn the garage WC area into a shower room
Pic of the PROJECT (A) basic move:
Pic of the garage WC:
Pic of the pantry area:
Garage WC and Pantry on either side of the same wall with the Garage WC being a step down:
Further pics and details here:
Move Garage WC to understairs Pantry and convert Garage WC to a Shower Room - https://photos.app.goo.gl/GtCgH2a9YbByReJy8
First step is PROJECT (A) and its a nightmare tyring to find one person/company to do this at this time. So working out what I can do myself and the plumbing is the main issue so hence posting here. Can post elsewhere if needed:
I think the steps to do PROJECT (A) is:
1 Get the plumbing in for the new WC by extending waste through the wall
2 Plumb in the feeds for the WC and small sink
3 Fix a stud wall for the cistern and pan to sit against
4 Do the pantry floor
5 Plumb and bolt in the WC
6 Plumb and fix in the sink
7 Fix an ventilation fan
8 Make a door into the hallway
9 Stud wall where the current door is
These steps make sense?
Anything I am missing or anything else worth considering?
Welcome feedback, will have questions. Ta!