Hi guys
Long time reader and lurker, got so much great advice...
Quick question, i have a Anhydrite screed currently that was put down in a wet room (Wet UFH 50mm thick) it is currently 50mm lower than the finished floor height needs to be.
My question is, would it be the following buildup be suitable:
1: Prime Anhydrite with BAL DPM
2: Apply adhesive BAL Rapid Set with uncoupling membrane BAL Rapid-Mat
3: Build up to just under the finished floor level with sand cement screed incorporating my falls to the linear drain
4: Tanking ontop of the new concrete (BAL Tanking kit)
5: Tile etc
Thanks
Adam
Long time reader and lurker, got so much great advice...
Quick question, i have a Anhydrite screed currently that was put down in a wet room (Wet UFH 50mm thick) it is currently 50mm lower than the finished floor height needs to be.
My question is, would it be the following buildup be suitable:
1: Prime Anhydrite with BAL DPM
2: Apply adhesive BAL Rapid Set with uncoupling membrane BAL Rapid-Mat
3: Build up to just under the finished floor level with sand cement screed incorporating my falls to the linear drain
4: Tanking ontop of the new concrete (BAL Tanking kit)
5: Tile etc
Thanks
Adam