R
ran
Hi All,
Im fitting a wetroom with a toilet and basin in a 3m x3m enclosed area in the garage. The area has been studded out using 3 x2 timber , the walls of the shower area have been fitted using hardibacker 12.5mm boards, the other walls are plasterboarded . The floor ,which has ceramic tiles fitted on a concrete floor has, now a dpc membrane overlapping 4" on the walls and then been raised, using 100mm celotex installation board, under floor speedfit (layflat) pipe fitted to the board (connected to the central heating system) and then 70mm of screed over the installation board. The wet room gully has been installed also under the screed/board. I believe i now need to tank all the shower area , as it will be tiled from ceiling to floor.
Can the forum please advise if this sequence is correct and which tanking product would they recommend, just for the shower area or the whole room.
Many Thanks
Im fitting a wetroom with a toilet and basin in a 3m x3m enclosed area in the garage. The area has been studded out using 3 x2 timber , the walls of the shower area have been fitted using hardibacker 12.5mm boards, the other walls are plasterboarded . The floor ,which has ceramic tiles fitted on a concrete floor has, now a dpc membrane overlapping 4" on the walls and then been raised, using 100mm celotex installation board, under floor speedfit (layflat) pipe fitted to the board (connected to the central heating system) and then 70mm of screed over the installation board. The wet room gully has been installed also under the screed/board. I believe i now need to tank all the shower area , as it will be tiled from ceiling to floor.
Can the forum please advise if this sequence is correct and which tanking product would they recommend, just for the shower area or the whole room.
Many Thanks