T
Theslippaking
Went and had a nose at a job this aft and left a bit baffled.the customer rang around three mths ago wanting 70m floor laid,but I was too busy and thought nothing of it.
He called again this week so I went and had a look.mainly wondering why no one had done it yet:-/
Its got a wet ufh system with a pumped screed,which is apparently a year old.it's had the heating active throughout the winter.i had a close look and it looks fine to me.no cracks anywhere,nice and flat.
Do i need him to shut the whole floor(3 rooms)off before fixing.and for how long?
Cant say I'm keen to get there,but needs must I spose.
He called again this week so I went and had a look.mainly wondering why no one had done it yet:-/
Its got a wet ufh system with a pumped screed,which is apparently a year old.it's had the heating active throughout the winter.i had a close look and it looks fine to me.no cracks anywhere,nice and flat.
Do i need him to shut the whole floor(3 rooms)off before fixing.and for how long?
Cant say I'm keen to get there,but needs must I spose.