D
davebates
hi guys just had a customer ring me about wanting a wetroom in a bungalow in the current bathroom. The base is concrete so no drain is fitted. I know this is currently beyond me im sure i could tank and tile it but as ripping up the base and having a go at fitting the drain im just not even going there. So the question is would you turn down the job or would you go about getting a builder in on the act to sort the base and drain and then complete the needed works after ??????? dilemma am i right in thinking that a channel needs to be cut out the floor from the drain to the wall and then the waste pipes run outside to drain i just dont know ???