S
swindon
Based in Southern Spain.Customer of mine wanted small back garden levelled and then tiled over, about 10 sq metres.
Seen the work this morning and the builder has levelled and put down a screed base about 2 to 3 inches thick.
He has tiled on top after a day and I am concerned if this is what should have happened.
As there is no specialist adhesives over here what is likely to happen next.
Seen the work this morning and the builder has levelled and put down a screed base about 2 to 3 inches thick.
He has tiled on top after a day and I am concerned if this is what should have happened.
As there is no specialist adhesives over here what is likely to happen next.