Hi All
Was meant to start tiling this conservatory today got there this morning and something is not sitting right with me. 600 x 600 B & Q 10mm ceramic tiles (against my recommendation).
I have added pictures to give a better idea. All advice is welcome.
To cut a long story short the area has been marked up and primed with BAl SBR. Customer had hoovered the night before.
I started in the top right corner with SBR with a ratio of 2 parts water to 1 part SBR. Changed to neat SBR for the rest of the room.
After an hour the neat SBR seems to have dried but the 2:1 still feels a bit damp.
Speaking to the customer he thinks the conservatory was started in Feb 9th this year. From his recollection is was around 200mm concrete and around 130mm screed. I have taken a few pics from the outside. To me it seems like its been raised to around 400mm in places.
I am no concrete and screed expert by any stretch of the imagination. I called Bal technical and they advised it should be fine but after doing some research online I am not sure.
I knocked it on the head for today and have left a dehumidifier running to see how much moisture it pulls out from now till tomorrow morning. Thought this might be a good indication.
All advice welcome.
Thanks
Was meant to start tiling this conservatory today got there this morning and something is not sitting right with me. 600 x 600 B & Q 10mm ceramic tiles (against my recommendation).
I have added pictures to give a better idea. All advice is welcome.
To cut a long story short the area has been marked up and primed with BAl SBR. Customer had hoovered the night before.
I started in the top right corner with SBR with a ratio of 2 parts water to 1 part SBR. Changed to neat SBR for the rest of the room.
After an hour the neat SBR seems to have dried but the 2:1 still feels a bit damp.
Speaking to the customer he thinks the conservatory was started in Feb 9th this year. From his recollection is was around 200mm concrete and around 130mm screed. I have taken a few pics from the outside. To me it seems like its been raised to around 400mm in places.
I am no concrete and screed expert by any stretch of the imagination. I called Bal technical and they advised it should be fine but after doing some research online I am not sure.
I knocked it on the head for today and have left a dehumidifier running to see how much moisture it pulls out from now till tomorrow morning. Thought this might be a good indication.
All advice welcome.
Thanks